In order to provide organized forms of illustrating community-based utilization of the Centre’s developments, the Centre has embarked on the establishment of pilot projects. These pilots’ projects also provide direct physical evidence that renewable energy technologies are indeed ready for community utilization. Indeed the pilot projects are also aimed at government utility agencies for them to install such technologies for the people. Since inception, the Centre had established sixty (60) pilot demonstration projects that cut across the various aspect of renewable energy technology across the Country.
S/NO | TYPE | LOCATION | POWER RATING | SPONSOR | DATE |
---|---|---|---|---|---|
1 | Biogas plant under construction | Model Sec. School UDUS | 1om3 | Energy commission of Nigeria | 2011 |
2 | Biogas Plant | Danjawa village | 10m3 | Energy commission of Nigeria | 2011 |
3 | 10M3-Biogas Plant at SERC Lab | SERC Lab | 10M3 | Energy commission of Nigeria | 2011 |
4 | 20m3-Biogas plant | Bioamss Lab Sokoto EnergyReseach Centre | 20m3 | Energy commission of Nigeria | 2011 |
5 | Biogas production PILOT PROJECTS | Not Available | Not Available | Energy commission of Nigeria | 2011 |
6 | 5kW wind electricity generation at Sayya Gida Gada | Sayya Gida Gada | 5kW | Energy commission of Nigeria | 2011 |
7 | 1.5kW Solar photovoltaic water pumping at mechanical workshop udus | udus | 1.5kW | Energy commission of Nigeria | 2011 |
8 | 2kW Solar photovoltaic Electrification at UDUNet | UDUNet | 2kW | Energy commission of Nigeria | 2011 |
9 | 2kW solar photovoltaic water at student hostels UDUS | UDUS | 2kW | Energy commission of Nigeria | 2011 |
10 | 2kw solarb Photovoltaic Water pumping at Birjingo Goronyo- L G Sokoto State | Sokoto | 2kW | Energy commission of Nigeria | 2011 |
11 | 2kW Solar photovoltaic Water Pumping at Kilgori, village Yabo L.G SokotoState | Kilgori | 2kW | Energy commission of Nigeria | 2011 |
12 | 4.5 Solar photovoltaic Electrification at SERC Labs | SERC Labs | 4.5kW | Energy commission of Nigeria | 2011 |
13 | 5kw Solar photovoltaiwc poered Repeater-Station,at Gwadabawa LG Sokoto State. | Gwadabawa | 5kW | Energy commission of Nigeria | 2011 |
14 | 5kw solar powered Repeater Statiooto Stan at Gwadabawa,L G Sokte | Gwadabawa | 5kW | Energy commission of Nigeria | 2011 |
15 | 7.2kw Solar Photovoltaic Electrification at Kwalkwalawam village, Wamakko L G Sokoto State | Kwalkwalawam | 7.2kW | Energy commission of Nigeria | 2011 |
16 | 100Lts Solar water heater at labour room Usmanu Danfodiyo University Teaching hospital Sokoto | labour room Usmanu Danfodiyo University Teaching hospital Sokoto | 100Lts | Energy commission of Nigeria | 2011 |
17 | 2kW Control Room at UDUNet, UDUS | UDUNet, UDUS | 2kW | Energy commission of Nigeria | 2011 |
18 | 7.2kw control room at Kwalkwalawa Village Wamakko LG SokotoState. | Kwalkwalawa Village Wamakko LG SokotoState. | 7.2kW | Energy commission of Nigeria | 2011 |
19 | Biomas Analysis Lab | Sokoto | Not Available | Energy commission of Nigeria | 2011 |
20 | Biomas Analysis Machine | Sokoto | Not Available | Energy commission of Nigeria | 2011 |